Best Android Apps

This App seems to have been removed from the Market! Learn more here

Package name: com.DragonGame.laser
Check on Google Play:
https://market.android.com/details?id=com.DragonGame.laser

Laser Laboratory (not available)

2.4 65 ratings
Downloaded 10,000+ times

Install From Google Play →

Developer: DragonGame

Android Advertising
Learn more


Categories: BRAIN
Similar to Laser Laboratory? Search with Fetch!

This app in currently not available for download from the official Android Market

On market.android.com: We're sorry, the requested URL was not found on this server.

Possible reasons:

  • The App is not available in your country
  • The App has been unpublished by its developer
  • The developer account has been closed by Google
  • The App has been suspended by Google
  • We may not be synchronized with the Google Play. Please report the problem to us.

Laser, one can think of CD-ROM, think of printers, think of the inventions of all kinds of human life.However, the most intuitive idea is that often appear in science fiction movies, magic and dazzling laser weapon.
The laser weapon is a laser beam along the direction of emission target of directed energy weapons, with a fast, flexible, accurate, and anti-electromagnetic interference, excellent performance can play a unique role in optoelectronic countermeasures, air defense and strategic defense.
Now we come to the laser laboratory to focus on the goal of the experiment in a range of different environments and angles, you need to turn the laser transmitter, and then adjust the refractor, and then click laser transmitter central laser-target laser refraction eradication of all the yellow ball.
Game features:

● high-resolution screen, iphone and ipad platform is also clear
● over 20 levels, you can choose. The new levels will continue to increase
●Touch the edge of the laser gun or mirror, rotate, touch the laser gun or mirrored center emission laser or mobile mirror

Size: 6.5M; Requires Android : 6 and up. pname=com.DragonGame.laser .apk

Tell a friend →

Best Android Apps

Laser Laboratory has got the Best Apps Award! Embed it on your blog/website!